The State Journal has posted my two articles from last week about the dedication ceremony for the hydroelectric plants at the Willow Island, Cannelton and Smithland locks and dams.
Here is the main story about the dedication and the power plant itself.
And here is a sidebar about how the river flow that day was almost too little to keep the plant in production.
Monday, October 24, 2016
Subscribe to:
Posts (Atom)