The generating units for the hydroelectric power plant at the Cannelton Locks and Dam should have arrived by now after a trip down the Ohio River from the plant where they were built.
If I'd known they were coming, I would have baked a cake, or else staked out a spot by the river to see them.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment